Scientific Reports from PCB Dredging Project

Listed below are some of the technical reports GE has developed for the Hudson River Dredging Project. Due to the length of some of the reports,  Adobe Acrobat Reader is required to download and view the reports.

GE’s Phase 2 Community Health and Safety Plan

To read GE’s Phase 2 Remedial Action Community Health and Safety Plan, click here (PDF, 10.1 MB).

Earlier Reports

Peer Review Panel’s Final Report on Phase 1 Dredging — September 2010

To read the full report, which includes the text, tables and figures, click here.

GE’s Final Phase 1 Evaluation Report — March 2010

  • To read the text of the report, click here (PDF, 1.9 MB)
  • To read the executive summary of the report, click here (PDF, 475K)
  • To download the entire report, including tables and figures, click here. Please note this is a large file that may take some time to download. (PDF, 50.9 MB)

Tables

 

EPA’s Final Phase 1 Evaluation Report — March 2010

To read EPA’s Final Phase 1 Evaluation Report, you can read it on EPA’s website here. (You will be leaving hudsondredging.com.)

To obtain copies of earlier scientific reports, please contact us at 518-792-4087, toll-free at 1-888-596-3655 or e-mail info@HudsonDredging.com

Please go here if you are looking for Hudson River Dredging data.